Delivering modern, integrated solutions
  • Home
  • Our Services
  • Jobs
  • Industry Updates
  • About Prefabrication
    • Exploring Prefabrication
    • Prefabrication Benefits
    • Misconceptions vs Reality
  • More
    • Home
    • Our Services
    • Jobs
    • Industry Updates
    • About Prefabrication
      • Exploring Prefabrication
      • Prefabrication Benefits
      • Misconceptions vs Reality
Delivering modern, integrated solutions
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out


Signed in as:

filler@godaddy.com

  • Home
  • Our Services
  • Jobs
  • Industry Updates
  • About Prefabrication
    • Exploring Prefabrication
    • Prefabrication Benefits
    • Misconceptions vs Reality

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Exploring Prefabrication Methods

Prefabricated Component Assembly


Off-site production of prefabricated components​. Individual elements are transported to site and assembled on site​. 


Benefits  

  • Reduced construction time on site, up to 25%​​ 
  • Can achieve up to 30% carbon reduction​ 
  • Up to 50% on-site labour reduction 


Limitations

  • Build height ​
  • On site assembly complexities​ by many site trades​
  • Supply capacity ​​
  • Perceived cost premium  



Volumetric Modular

Off-site factory fabrication-volumetric modules, transported and installed at site​​. Modules are complete rooms and spaces of buildings, including fixtures and fittings.​

 

Benefits

  • Potential for higher quality control​
  • Less disruption to areas surrounding the site​​
  • Up to 70% reduced construction time on site​
  • Up to 45% carbon reductions​
  • Up to 85% on-site labour reduction​

 

Limitations

  • Module dimension limitations​​
  • On site assembly complexities​ for some site trades​
  • Perceived cost premium & upfront payment requirements 

Hybrid Systems

Combines conventional on-site techniques with prefabricated systems. Leverages strengths of both methods to optimize total value in the building process.


Benefits 

  • Flexibility in design and integration ​
  • Optimized benefits & value drivers for specific project requirements 
  • Significant reductions in schedule and on-site labour


Limitations

  • Coordination complexity​
  • Potential for increased costs, with inexperience or poor planning

Our Services

Copyright © 2025 Oliphia Associates - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept